1. The tanker in the tanker equipment ① inspection of shift and shift operations; inspection method: listen, whether the operation sound of the tanker is normal; look, whether there is leakage or deformation at the connection of the tanker shell and the parts of the whole machine, and the display Is it normal; smell, with or without peculiar smell. ②Daily maintenance. When changing shifts and refueling idle time, the oiler wipes the housing of the oil dispenser to keep it clean and free of dust and dirt; often open the door of the oil dispenser to wipe off the dirt inside the machine; oil the pump bearings, counter bearings and transmission parts; belts Whether it is loose, whether the wiring is loose.
2. 연료 디스펜서 장비의 오일 탱크: 스틸 오일 탱크여야 하며 탱크에 용접된 지지 프레임이 있어야 합니다. 용량은 일반적으로 15{3}}50m3입니다. 묻힌 탱크는 부식 방지여야 합니다.
3. Process piping and accessories of the fuel dispenser equipment ① Oil suction pipe: equipped with a bottom valve, 15cm from the bottom of the tank. ② Oil discharge pipe: 0.2m from the bottom of the tank, the port has an inclined port; the oil discharge end is connected with the tank car hose by a sealed quick joint. ③ Oil measuring hole: It is used for metering and should be opened on the center line of the manhole; ④ Breathing pipe: Install flame arrester at the pipe mouth, the diameter of the pipe is not less than 50cm, the height from the ground is not less than 4m, the distance from the wall is not less than 3m, and the distance from the building is not less than 3m. Doors and windows shall not be less than 1m.
4. 탱커 장비용 맨홀: 유지 보수, 탱크 청소, 교정 및 기타 작업의 입구 및 출구는 볼트로 매립 및 연결할 수 없습니다.
5. 탱커 장비의 방화구 : 탱크 호흡 파이프 상단에 설치되어 기름을 내릴 때 배기하고 연료 보급시 흡입합니다.





